pic-01

NEED EXTRA HELP?

Do you need extra expertise on an ad-hoc basis to assist with unexpected challenges and problems?

pic-03

OPERATIONAL RESILIENCE HEALTH CHECK

When did you last check that your operational resilience processes are fit for purpose?

INSIGHT BLOG

Reducing Risk Management Risk

Reducing Risk Management Risk: applying simple procedures to mitigate risk that risk management plan is deficient.

 

Extract from Chaco Canyon Consulting “Point Lookout” – Rick Brenner:

Risk plans are rarely perfect. For complex projects, unanticipated risk will almost certainly materialize. We can deal with this risk — I’ll call it risk management risk — if we adopt some simple practices. Let’s begin with some examples of organizational and political risks.

Organizational blind spots

Organizational risk management asset bases usually consist of previously developed risk plans and risk plan elements, documented risk plan development procedures, and personal experiences.

Although referring to these assets might uncover risks that any particular risk manager might not otherwise consider, relying on the asset base probably won’t uncover risks not included there. Since continuous organizational change almost certainly exposes the organization to risks never before seen, these asset bases have blind spots.

To limit these blind spots, analyze the results of retrospectives to determine what risks were unanticipated. They provide clues to the location of the organization’s blind spots.

Organizational political correctness

In general discourse, political correctness requires that we shape our statements and behavior — if not our opinions — to conform to a generally accepted ideological standard. Organizational political correctness provides an analogous constraint relative to the ideology and views of the organization.

Organizational Organizational political correctness can limit the ability of risk managers to address significant riskspolitical correctness can limit the ability of risk managers to address significant risks, when even discussing such risks calls into question organizational beliefs, or the beliefs of those who have internal political power.

If a common theme appears among unanticipated risks, if those risks are evident to many, and if the same risks materialize across many projects, organizational political correctness could be a cause. Organizational culture change is required to address this risk.

Political risk

The organizational value of any project is determined, in part, by the political clout of its advocates. How an organization values a project can present risks to it through resource allocation, schedule, and budget.

Although these risks are widely understood, talking about them openly and planning for them in writing is often difficult, for reasons far beyond organizational political correctness. For the politically weak project, committing to writing and review any plan to deal with political risks simply provides a roadmap to rival projects if they are politically stronger. Such a risk plan is often effectively countered before it can be implemented. In some cases, it might even be forbidden. This effect is especially pronounced if a state of toxic conflict persists between the departments, leaders, or champions of the two projects.

Two factors suggest the presence of political risk. First is the absence of any explicit mention of political risk from the risk plans of politically weak projects. A second indicator can be changes in the execution plan of politically stronger projects, especially following publication of the risk plan of a politically weaker project.

More … http://www.chacocanyon.com/pointlookout/100317.shtml

Oct 31 2012

Risk Management

Leave a Reply